Fuller Road Culvert

An early start for Bob Willis of LHV Precast. BP Excavation of Little Falls led by Project Manager Cody Petras is setting the three-sided culvert on invert slabs with retention sills. The project is located at Fuller Road over Steuben Creek in Steuben County. The culvert is 70 liner feet in length. This culvert includes […]

Legion Way Box Culvert

Legion Way Box Culvert - Aerial Shot

Removal and replacement of 34.66 feet of box culvert at Legion Way in the Village of Mount Kisco. The box culvert pieces were 15’-0” x 6’-6” with two attached headways. There were also two cut-off walls measuring 17’-6” x 3’-0” x1’-6”. The project was performed by PCI Industries and led by Project Manager John Roegge. […]

Route 30 Culvert

Friend Commercial Contracting Culvert Completed

LHV Precast is proud to be part of NYSDOT Region 7 Project D265146 for Route 30 in the Town of Duane. The challenging project called for the excavation and installation of a three-sided culvert for the Deep River flow. The site was near the local boat launch. Friend Commercial Contracting’s team built a coffer dam […]

Morner Road Culvert

Morner Road Culvert

Removal and replacement of box culvert under Morner Road in the Town of East Greenbush, NY. The existing structure was replaced by a 14-foot precast concrete box culvert.

Burgher Road Culvert

Burgher Road

As part of the Ulster County plan to upgrade local bridges the Burgher Road Culvert project created a new span under Burgher Road. The culvert was 28 feet in length with attached wing walls on either end. The project was won by Kingston Equipment Rental and supervised by Brian Jurkowski. Precast engineering was performed by […]

Gardiner Culvert

Gardiner Culvert

Precast Culvert and wing walls. 35.5 linear feet of 16′ x 7’ box culvert. The project allowed Route 44 to cross over the Wallkill River in Gardiner, NY.

Pleasant Valley Culvert

Pleasant Valley Culvert

Replacement of the Pleasant Valley Road Culvert. The new culvert replaced the failing culvert previously located there. The project was designed by Richard Tremblay, PE of Barton and Loguidice PC. Site construction was performed by Bothar Contraction led by Project Manager Scott Van Blarcum. Precast Engineering was performed by Ronald Thornton of Concrete Engineering Solutions. […]

Tillson Avenue Culvert

Tillson Three Sided Culvert Off Truck

The project consisted of the excavation and installation of a 59.75 liner foot box culvert and wingwalls along Tillson Ave in Highland, New York. The culvert was manufactured in 9 pieces including skewed inlet and outlet ends. The weights of the pieces varied between 22,360 and 30,140 pounds each. The site contractor was A Colarusso and […]

Chenango Box Culverts

Chenango County Box Culverts

In two days Rifenburg Construction Inc. installed 18 pieces of twin cell 20′ x 9′ x 4′-8.5″ precast concrete box culvert sections along with six sections of wing walls and aprons. Shear key joints were used for wing wall and apron connections while a shiplap joint was used for culvert joint connections. Cut-off walls were […]

Big Pond Road

Big Pond Road

The objective of the Big Pond Road culvert replacement was to replace two 4′ high by 6′ wide corrugated metal arched (CMA) culverts with larger embedded 5′ high by 8′ wide precast concrete box culverts. During and following Hurricane Irene and Tropical Storm Lee it became apparent that a new larger culvert was essential because […]