Extra Space Storage

Extra Space Storage

This project called for a Stone Strong retaining wall to create a more level usable property and bring the footprint above the flood zone. The project is located on Washington Avenue in Kingston, NY. Once this was complete, they constructed a climate controlled self-storage facility on the property. Site Work was completed by Schmitt Excavating of […]

Caretakers Road

Caretakers Road over Walloomsac River

The project includes the replacement of the existing Caretakers Road Bridge over the Walloomsac River. The bridge is approximately 1,000 feet south of the intersection with Route 67 in the Town of Hoosick, Rensselaer County. The site work and construction were performed by William J Keller and Sons of Castleton, NY. The bridge abutments and […]

Liddle Brook

Liddle Brook – Andes, NY

Delaware County Soil and Water Conservation District (DCSWCD) funded this project at Andes Central School. The project replaces the failing walls along Liddle Brook with NYSDOT compliant Stone Strong blocks as the streamliner. The project is funded in partnership with the Catskill Watershed Corporation (CWC). DCSWCD Stream Program is funding the stream restoration, while CWC […]

Coxsackie River Road

Coxsackie River Road

The project involved the excavation and removal of an old retaining wall. The wall was replaced by 127 Stone Strong Blocks with the chiseled granite finish. The blocks were placed to create an aesthetically pleasing off-street parking area for two apartment buildings in the Village of Coxsackie.

Saw Mill River Parkway

Saw Mill River Parkway

Demolition and replacement of 192 feet of retaining wall along the Saw Mill River Parkway Eastbound ramp to I-287. The project consists of 9,932 square feet of wall extending 9 courses above grade. The wall is made up of 188 24-square foot blocks, 65 6-square foot blocks, (3) 9-square foot corners and 1 3-square foot […]

Tempel Lane Improvements

Tempel Lane Improvements

Project was led by the Town of East Greenbush for the widening and repair of the Tempel Lane and 3rd Street intersection. The project involved 6 Stone Strong walls covering over 8,000 square feet. The project was designed by Chris Cornwell of Greenman Pedersen, Inc. for the Town of East Greenbush. Project layout and production […]

Dutchess Rail Trail

Dutchess Rail Trail

Dutchess County is building out the new trail system on the former CSX rail property within the City and Town of Poughkeepsie. Shaped like a wishbone, the trail system has eastern and western spurs, with on-street connections to facilitate movement and maximize trail access. Construction is occurring in phases with completion anticipated by the end […]

Pioneer Bank

Pioneer Bank After

Removal and replacement of retaining wall supporting the entry of the shopping plaza with the Pioneer Bank branch. Location of the project was 1712 Hoosick Street, Troy, NY 12180. The project consisted of the setting of 1941 square feet of Stone Strong Retaining Wall Block (149 blocks) covering the existing wall which was deteriorating.

Nyack High School

Nyack High School

Landscape Unlimited, Inc. has been working with LHV precast and the Stone Strong retaining wall system since 2007. They feel it is one of the best retaining wall systems on the market and clearly the best big block system. They promoted the system to Nyack Schools during the contract preconstructions, the school accepted the system […]