Our Posts
The end of 2023 saw LHV PRECAST INC Precast crews producing a tunnel project we have been working on with Contech Engineered Solutions and...
Just in time for Christmas we have received our Mixer Systems, Inc. Model 200 Turbin Mixer. While Santa did not have to...
October saw the acquisition and installation of our new 24‘ wide by 72’ long (1728 sq ft) flat casting table....