Old Croton Trailway State Park

Yonkers, NY
Completion Date: XXXXX
Project Engineer: McLaren Engineering Group
Contractor: Moretrench

The lagging walls consist of dual “H” piles nailed to the soil. Between the “H” piles 6′ x 8′ lagging panels were set in place. The panels were made of precast concrete with a gray color in a natural stone pattern.

More Projects

Coxsackie, NY
Coxsackie River Road
Troy, NY
Pioneer Bank
Hudson, NY
Dutchess Rail Trail